Image of pipe infrastructure.

Big Shift Photo Gallery

Big Shift Photo Gallery

Beginning the summer of 2020, and for the next two years, we are going to replace our campus’s oldest, natural-gas powered steam system – located throughout the Quad District – with a new, renewable-energy-powered, hot water system. These photos document some of the complicated construction involved in altering how our campus shifts to carbon neutrality.

Photos by Dan Golde, project manager, UC Davis Design and Construction Management

Photo(s)