Big Shift Construction - Fall 2020
Big Shift construction crews are hard at work creating a more sustainable campus one trench at a time.
Check out different construction sites as crews trench, perform surface restoration and prepare to install lateral hot water pipe runs to building.
Photos by Dan Golde, project manager, UC Davis Design and Construction Management
Photo(s)