Construction Activity as of August 6, 2020
The biggest impact remains the closure of North Quad.
Approximately four crews will be working during this timeframe. Crews 1 and 2 are installing pipe on North Quad while Crew 3 does the same on East Quad. Crew 4 is working near the Enology Lab Building on the construction of a heat exchanger building as well as nearby trenching.
Please note that the pedestrian crossings shown through the fencing on the map may be closed at some points during construction for public safety reasons.
- Using the Map
- See the legend. Click the icon next to the title "Big Shift Detour Map" This toggles the map's legend to appear.
Zoom in. use your mouse's scroll wheel or track ball when hovered over the map portion.
Full screen. To view the map in full screen mode, click the "four corners" icon in the upper-right-hand corner of the map. (Once in full screen mode you can click on the plus and minus icons located in the lower-left-hand corner of the map.)
Detail view. To zoom in on a specific segment, click the title of that segment in the map's legend.
Crew 1 |
June 8 - August 21, 2020 |
Location: |
North Quad & California Ave. Heading East |
Activity: |
Hot water pipeline installation, placement of Gilsulate insulation, backfilling. Trench excavation and installation of replacement domestic water line. Backfilling and temporary pavement patching – Fenced area |
Noise: |
Medium level, occasional jackhammering |
Closures: |
North Quad will be closed |
|
|
Crew 2 |
June 8 - August 14, 2020 |
Location: |
North Quad at West Quad Heading East |
Activity: |
Placement of Gilsulate insulation, backfilling and pavement patching – Fenced area |
Noise: |
Medium level |
Closures: |
North Quad will be closed – some sidewalks may not passable |
|
|
Crew 3 |
June 4 - September 4, 2020 |
Location: |
East Quad at Memorial Union |
Activity: |
Placement of Gilsulate insulation, backfilling; hardscape restoration – concrete demo and pouring of replacement concrete sidewalks – Fenced area |
Noise: |
Medium level, occasional jackhammering |
Closures: |
Access to Memorial Union is limited from East Quad |
|
|
Crew 4 |
May 26 - November 30, 2020 |
Location: |
West of Enology Building |
Activity: |
Construction of Enology Heat Exchanger Building - Trenching, excavating, underground pipe installation - Fenced area |
Noise: |
Medium level |
Closures: |
None |
Tags