Construction Activity as of August 6, 2020

The biggest impact remains the closure of North Quad. 

Approximately four crews will be working during this timeframe. Crews 1 and 2 are installing pipe on North Quad while Crew 3 does the same on East Quad. Crew 4 is working near the Enology Lab Building on the construction of a heat exchanger building as well as nearby trenching.

Please note that the pedestrian crossings shown through the fencing on the map may be closed at some points during construction for public safety reasons.

  • Using the Map
  • See the legend. Click the icon next to the title "Big Shift Detour Map" This toggles the map's legend to appear.  button
    Zoom in. use your mouse's scroll wheel or track ball when hovered over the map portion. 
    Full screen. To view the map in full screen mode, click the "four corners" icon in the upper-right-hand corner of the map. (Once in full screen mode you can click on the plus and minus icons located in the lower-left-hand corner of the map.)
    Detail view. To zoom in on a specific segment, click the title of that segment in the map's legend.
Crew 1 June 8 - August 21, 2020
Location: North Quad & California Ave.  Heading East
Activity: Hot water pipeline installation, placement of Gilsulate insulation, backfilling. Trench excavation and installation of replacement domestic water line. Backfilling and temporary pavement patching – Fenced area
Noise: Medium level, occasional jackhammering
Closures: North Quad will be closed
   
Crew 2 June 8 - August 14, 2020
Location: North Quad at West Quad Heading East
Activity: Placement of Gilsulate insulation, backfilling and pavement patching – Fenced area
Noise: Medium level
Closures: North Quad will be closed  – some sidewalks may not passable
   
Crew 3 June 4 -  September 4, 2020
Location: East Quad at Memorial Union
Activity: Placement of Gilsulate insulation, backfilling; hardscape restoration – concrete demo and pouring of replacement concrete sidewalks – Fenced area
Noise: Medium level, occasional jackhammering
Closures: Access to Memorial Union is limited from East Quad
   
Crew 4 May 26 - November 30, 2020
Location: West of Enology Building
Activity: Construction of Enology Heat Exchanger Building - Trenching, excavating, underground pipe installation - Fenced area
Noise: Medium level
Closures: None